On a stick build ...
I used 1 x 4's once. Joining was a lotta work.

21 joints x 2. If I recall, it took me three days to finish the two structures and have them ready to sheath.
There's a much quicker way to do it.


Using 8' plywood, you can make the wall as long as you want with spline joints.

I can crank two out two skeletons in an afternoon. The other advantage is they give you much more design flexibility.
Tony