Postby Daryl » Sat Feb 28, 2009 4:55 pm

In cooler spring time temps what have you found the best time to allow for a full cure of TITEBOND III glue ? thanks much Daryl
User avatar
Daryl
Teardrop Builder
 
Posts: 26
Images: 20
Joined: Thu Dec 25, 2008 10:32 am
Location: N.E. Ohio

Postby wannabefree » Sat Feb 28, 2009 9:07 pm

Spring, summer, winter, doesn't matter. Clamps are off in half an hour. Of course, I live in sunny Arizona 8)
In anything at all, perfection is finally attained not when there is no longer anything to add, but when there is no longer anything to take away.
-- Antoine de Saint-Exupery
User avatar
wannabefree
The 300 Club
 
Posts: 380
Images: 82
Joined: Fri Jul 11, 2008 11:00 pm
Location: Phoenix

Postby bbarry » Sun Mar 01, 2009 8:54 am

While you can remove the clamps within a relatively short period of time, I'd leave it overnight before working on the piece again. 24 hours should give you a full cure in just about any weather.

Brad
Brad

****************************
Jack of all trades, master of none.
****************************

Kampster build thread
User avatar
bbarry
The 300 Club
 
Posts: 360
Images: 159
Joined: Sun Dec 14, 2008 9:03 am
Location: Clearwater, KS
Top

Postby Mark McD » Sun Mar 01, 2009 10:46 am

Dry time and cure time are two differnet animals. Most yellow wood glues have an initial tack time ,(workable time), of a few minutes but the cure time is usually a few hours. Leave it clamped up overnight if possible.

Weather certainely affects dry and cure times. Up North here were I live I have to plan my glue-ups carefully so I can be sure the heat doesn't drop below freezing while my projects cure. Yellow glue will freeze, not good If it's not cured.
I like turtles
Mark
I don't feel tardy
User avatar
Mark McD
The 300 Club
 
Posts: 427
Images: 63
Joined: Sat Jan 19, 2008 12:53 am
Location: Northeast Ohio
Top

Postby wannabefree » Sun Mar 01, 2009 9:50 pm

Humidity and wood moisture content play a big role, which is why I mention I live in AZ. Here the wood is so dry (maybe 4% MC) it literally sucks the moisture out of the glue. Glue sets hard enough to work in half an hour. Often to extend working time I wet the edges I'm glueing and mix a little water in the glue. Like I said, clamps are off in half an hour and I'm working the piece unless I'm going to put a lot of stress on it. There is one condition where I do allow 24 hour dry time -- when edge glueing boards. If you surface edge glued material too soon you end up with gullies at the glue line because the wood swelled when it soaked up the mositure from the glue, then you surfaced it, then it shrank.

So the answer is: it depends. 2-4 hours clamp time is more than sufficient under most conditions, though. If in doubt, check the squeezeout. If it's stiff and plastic-like and can be scraped off with a blade without smearing, it's hard enough to take off the clamps. In fact, when the squeezeout is at this state it's the ideal time to remove it with a scraper.
In anything at all, perfection is finally attained not when there is no longer anything to add, but when there is no longer anything to take away.
-- Antoine de Saint-Exupery
User avatar
wannabefree
The 300 Club
 
Posts: 380
Images: 82
Joined: Fri Jul 11, 2008 11:00 pm
Location: Phoenix
Top


Return to Teardrop Construction Tips & Techniques

Who is online

Users browsing this forum: Jimbodub and 7 guests