Towed Hall, Week 2: The floors are in, the foot wells boxed in, and all is painted inside and out. For years I've done sloppy joints (first message) and just found that my small square (aft) is small but hardly square. Since I'm also learning to saw straight, we'll see if things improve.
Fortunately, any problems with, uh, recycled plywood (to right) and small lumber (below), and um, emerging carpentry skills respond to putty, caulk, and foam. Note that the thin gaps at the floor are for tucking in carpet without needing trim, and are closed off.
Alas, in this small town, the closest I could get to a 5.70-8 tire was zip, and it turns out there are actually two diameters so numbered, so it must be a tape-measured sale. I'll try Daytona after spring break.
I'm having a ball! Hope you are, too.