concept

floor done

wall framed and covered inside

walls up

cooler test fit

the big bend

ceiling in and framing started

wall insulation

outside walls on

door and window test fit

hatch on

roof glassed and side epoxied

not complete but ready for camping over the 4th

still need the kitchen area and cabin completed and some gas struts for the hatch. along with another epoxy fill coat to fill in the cloth weave and then paint.