It has been about a month since I last posted any updates to this build. Mid June I took a camping trip to make sure I was building all the amenities needed in my teardrop. Unfortunately I had a few misfortunes on the trip. I was stung by a yellow jacket, had an allergic reation, passed out as I was trying to get to the ER, as I fell to the ground I severly twisted my ankle and my leg. The moral of this camping trip was to be equiped for any camping trip with an EPI pen. My ankle is still not well but I've managed to get a few hours of work in this past week.
Second wall up last weekend and this weekend spars cut and attached and first door cut.
I ordered my doors, henge, fan, from Vintage Technologies and they arrived in about 5 days, just when I was laid up with my leg. I also purchased my air conditioner just prior to the camping trip. Last week I ordered the AC/DC panel on eBay. I'm about ready to begin running the conduit under the floor for the AC wire. I also puchased some primer to begin priming the sides before I get too much obstruction mounted to them.
It has been so hot I've been blowing the air from the house into the garage with the door closed. It still is hot but much more bearable. I don't look forward to seeing the Georgia Power bill!
Here are a few pictures of my slow/go progress.
Thanks for your continued feedback. I could never have gotten this far without the resources of this forum.



