The Monday update......
Finally was able to get the fiberglass tub / lavatory combo freed from the floor and safely removed.
The monster propane electric fridge was walked to the edge and while attempting to set it off the frame I attempted to bear hug it and set it down on the ground.....
~~~~WRONG ~~~
It was way to heavy and rode my leg down to the ground and mashed my foot. So a little neosporin and we are good to go again. Thank God I had on heavy jeans and boots rather than shorts and sneakers.
So, in disgust ,I sought out pain medication in 12 oz. portions and called it a day.
Sunday AM I was back at it ! With the deck now clear of appliances and plumbing fixtures I took my circular saw and cut the rotted 3/4 floor into squares and pried it up a section at a time. A couple minor puncture wounds to my hands from nasty old rusty nails and I went looking for some hydrogen peroxide and the neosporen again
I had the first 6 feet removed and now the back 5 feet clear I carefully stepped up and started on the center section between the wheel wells. About 30 minutes into the floor removal I stepped back and ran a nail thru my foot

I pulled the board ,nail and all ,off of my foot and now completely pissed , I ripped with a vengance. About a half hour later I ,once again , doctored my latest wound. I am 3 under floor joist and 6 square feet of floor from being down to the frame. The mess is swept up and what wasn't burned in a bonfire last night is waiting at the curb for my trash guy. While I didn't get as far as I had hoped. It did give me time to think and rather than getting excited and just tossing down a new floor. I think I will slow down a bit and work a bit more thoughtfully on the tankage and under floor plumbing before simply tossing down new lumber for the floor. Well guess I will stop of at the drug store for a few first aid supplies

and hit it for an hour or so after work today.