I found a few more "Boogy Men" I had to take care of before I could install and move the new axle forward.
First off the dropped floor came back into the new axle area so I had to shorten the dropped area. Did so by using the handy mans second secret weapon, Bed Rail. I added more steel to the outside perimeter of the dropped area to give all corners some positive support, removed the old axle and installed the new one 6" ahead of the old.
THEN THE RAIN CAME!


All I have left on the frame is to cut the tails off the end of the frame to make it a 13'er but I don't think I'll do that till I make the side walls.
Hope to have the floor done and Tared by Sunday.
Happy Trails
Len