One more shot of the installed hard points that bolt wall to floor with flathead 1/4" bolts
[img]

[/img]
and
[img]

[/img]
Walls then installed - using GS to attach to the walls to the wood brackets that are secured to floor with construction adhesive, thne bolts through the walls and the melamine pieces glued to the inside of the 2" X 3/4" wood brackets.
[img]

[/img]
[img]

[/img]
[img]

[/img]
The front spars installed - all rabbitted to create a nest for 3/4" poly ceiling strips. These will be covered with single sheet of 3/4" over the top, then canvassed/painted. Chamfered the spars.
[img]

[/img]
I added a bracket to esnure that nose and walls are mechanically attached in addition to GS.
[img]

[/img]
All came together as planned. Everything square and appeared to be solid. Next comes the first layer of ceiling,then wiring, then the 2nd payer of ceiling and canvassing the exterior. Then the hatch, then the three doors. Long ways to go.
Will be taking a two-weeks break for travel, then back at it in mid-August - appreciate the views and comments.
Charlie