I managed to get the Marmoleum flooring installed, and last night finished up the door side floor cabinet. The electrical panel and the alarm system will go in the bottom, upper 2 drawers are for clothes, it still needs a top for it. I also am using some highly figured birch for the face on the galley. I shot some finish on it tonight, but still needs a couple more coats. Also got the original ice box restored which will go into the large opening on the right hand side of the galley frame.
It's 7pm and still 95F in the shop. This won't go out this year, as the cabinetry and interior is killing me on time. That's OK...I still have 2 others to use in the meantime. Thanks for watching. Doug

