I took some time this glorious Easter morning, it reached 84 F here today, and got the camera out. Here is the latest status report.
Started working on the bench/bed/galley. I think I mentioned last time that there would be some changes from my original ideas. First one is the lower galley storage. I decided to extend that storage up under the crossways bench.
This gives me 36 inches deep storage. It will be accessible from inside by lifting bench lid. You can see the bench lid up front waiting for the glue on the cleats to dry. In the photo the first section will support the upper galley.
Here I have moved in the lengthwise benches.
The driver's side entire length is hinged for access.
The passenger's side only the back foot is hinged. The piece you see in the top partially blocking access will make sense in a minute.
This is the front side of the passenger side bench. I salvaged some old heavy duty server mounting rails and made a drawer. It slides out in front of the door to allow easier access to storage.
Here is the front of that piece that was partially blocking the storage two photos back. It slides forward a foot to extend the bed. The drawer supports it as well.
I got some finish on the outhouse the other day.
A shot towards the back. I have not yet cut the center filler for the bed.
The "outhouse" is mounted permanently. The other benches/galley are modular and will be removable.
Still pondering on the upper galley final design...
Til next time
