We had too much of a gap where the side wall fits into the trailer so we cut 3/4" pieces of wood and filled in with liquid nails. We made a piece that was 1/16" deeper to push the wood down to the correct depth.
We drilled pocket holes every 12" along the edge of the floor.
Checked pocket hole screw length and decided that 1 1/2" worked best.
We had to run the wiring for the exterior lights before gluing the interior skin
Now we glued the interior skin onto the side wall, using NTPPW (new technology- potted plant weights)
We added few more clamps. Can you really ever have too many of these?
We removed the bondo from this gap and added a trough for the wiring.
Decided to use screws to hold the skin on since we are going to paint the walls. Oh, and apparently we did NOT have too many clamps-actually ran out
We are using spline joints to join the 2 side walls. After using the router to cut 1/8" spine joints, we are testing the fit-perfect.
We cut 1/8" by 15/16" splines to fit into spline joints.
After 4 weeks of working in the hot, south TX sun, fellow teardroppers, Big-D, Brandi, Richard & Diane offered us a huge garage space to finish our build, so we are packed up and ready to move.
We are so appreciative for this gracious gesture. Without proper shelter, we have been building and storing all our work and supplies in our living room, kitchen, hall & bedrooms (as you can see from previous pics)
Lianna & Alan
