Thank you very much gentlemen!!! Your compliments and encouragement keep the flames burning on this puppy.
We got quite a bit done over the last two weeks even with last weeks tent camping thrown in...all the cabinet fit and assembly is done! Yeah baby!!!

Upper aft cabinets with the doors closed.

This shot shows the 1/4" ply electrical run cover in place.

I finally routed the hand grabs for the drawers under the cabinet.

The new hinges worked just right for the little media door. Now I just need to make the fold-out wire rack.


A couple of shots showing how the adjustable shelves look installed.

Got the top galley cabinet installed with new sliding doors (I drilled one of the holes in the wrong edge...). You can see the 1/4" wiring chase cover inside.

The galley all ready for finish.

While I was cutting 1/4" ply, I got the interior cover cut for the tongue box done.




A few shots of the front cabinets with their doors all nice and fitted up. There's more room than I figured in the big lower ones which were intended for nightly shoe storage. Our shoes will easily fit in the center one. I'm sure we'll find a use for the extra storage.

Yes, that's the first layer of insulation installed in the roof! We'll be on to wiring soon!
All the best,
Dave